Monday, September 29, 2014

Week 7 goals

Review the requirements for the Proposal intro, after having reviewed them, complete the introduction and title page for the Proposal.

Friday, September 26, 2014

Week 6 End

After rigorous researching about the various parts, I have come to the conclusion that all parts are compatible with each other, but I will need thicker wire than initially expected, solar panels take one to week to ship, all other parts are in stock and ship in 2-3 business days. The lumber is at home depot and can be purchased.

Monday, September 22, 2014

Week 6 goals

Send out emails regarding finding an individual to mentor me. Research more into details about the parts required, check that everything is compatible with each other and there are no conflicts between different parts. Also check what parts are in stock.

Thursday, September 18, 2014

Timeline

Timeline:


Timeline    
Week of 10/6-10:  Check for responses from sponsors. Ensure funds for parts are available. Send another email if necessary. Check over solidworks and parts list to make sure all parts are readily available.
Week of 10/13-17:  Order parts for bench needed. Draft a plan to build bench/ layout all the materials as needed. Check if all tools required for building are available. Acquire tools that we do not have Ex: Jigsaw
Week of 10/20-24: Start building the body of the bench, also work a bit on writing the body of the research proposal.
Week of 10/27-31: Finish building the body of the bench, make the necessary holes/ mounts for the canopy to attach to it.
Week of 11/3-7: finish bench/ start building canopy
Week of 11/10-14: finish building canopy / start testing
Week of 11/24-28: finish testing
11/17 - 12/19 - Work on research proposal + ask someone to proof read.
12/22 - 1 /26 - Work on the project portfolio/ finish anything else needed.
2/2 - 2/27 - Organize poster board/ work on powerpoint
3/9 - 3/30 - Finishing touches on project overall

Monday, September 15, 2014

Friday, September 12, 2014

Tuesday, September 9, 2014

Week 4

Blogger was down yesterday, so this is weekly goals for week 3.

  • Create an electrical drawing of the array.
  • Create an advanced budget.

Friday, September 5, 2014

Update week 2

The budget is composed below and the bench is drawn up. look at picture below.

MONEYZ


$179.99 - Solar panel with charge controller and mounting brackets
$50 - lumber
$15 - brackets and screws for lumber
$19.33 - 2 usb port
$14.95 - step down from 12v to 5v
$13.00 - led strip
Total - $292.27

Tuesday, September 2, 2014

Week Two, maybe servers are online now.

Goals for week two

  • Try to draw up the bench again ( week one goal that was delayed due to problems with server certification)
  •  Get a rough budget
  • look at different bench styles